Home / Guides / Preparing your rig for an Atlantic crossing
Preparing your rig for an Atlantic crossing
In short
- Contact your rigger 6 months before departure for a small sailboat, and 9 months to a year for a large boat or a bigger project.
- The 5 issues we find most often: seized turnbuckles, the furler, sheaves jammed or cracking, hidden corrosion on structural points, and running rigging worn where you can't see it.
- Carry a spares kit: furler foil screws, soft shackles, clevis pins and split pins, a spare halyard and Dyneema, plus the rope-work skills to use them.
- A full inspection, with the mast down if possible, is still the best protection against losing the mast mid-Atlantic.
When to start preparing
Earlier than you think. A rigging replacement, a furler service or a part to order can take several weeks, and riggers are very busy in the months before the crossing season.
| Type of project | First contact |
|---|---|
| Small sailboat, simple preparation | 6 months before departure |
| Large sailboat or catamaran, bigger project (rig replacement, new headsails, furlers) | 9 months to a year before departure |
This leaves time for the inspection, ordering parts, doing the work and above all sailing with the new rig before you leave, to fine-tune it.
The 5 issues we find most often
1. Seized turnbuckles
This is the most common defect. A seized turnbuckle prevents proper mast tuning, and it is also a sign of tired material. It must be replaced before departure, not forced.
2. The headsail furler
Furlers often have weak points: loose foil screws, tired bearings, a worn top swivel. These are often simple repairs, but they must be checked by a professional. On a crossing, the furler works day and night.
3. Sheaves jammed or cracking
A seized or cracked masthead sheave will end up jamming a halyard. Mid-ocean, that is unpleasant at best, and sometimes means going up the mast at sea. You see it by going to the masthead, not from the deck.
4. Hidden corrosion on structural points
Chainplates, spreader fittings, mast step, boom attachments: corrosion hides under fasteners and where water collects. These are structural points that do not forgive under the load of an Atlantic swell.
5. Running rigging worn where you can't see it
Halyards and reef lines wear inside the mast and boom, where they run over sheaves and through leads. The rope looks new from outside but is chafed where it works. You only find out by pulling it out completely.
The rigging spares kit to carry
- Furler foil screws, of the right reference for your model.
- Soft shackles in several sizes.
- Clevis pins and split pins matching your turnbuckles and fittings.
- A spare halyard, as long as your longest halyard.
- A length of Dyneema, to make an emergency shroud, a strop or a lead.
- And above all, the rope-work skills to use it: a kit without know-how is useless at sea.
Pre-departure checklist
- Have the rig fully inspected, ideally with the mast down, with a written report.
- Replace the standing rigging if it is near the end of its life, turnbuckles included.
- Service the headsail furler and any other furlers.
- Check and replace tired sheaves at the masthead and mast foot.
- Pull out and check all running rigging, including inside the mast and boom.
- Put together the spares kit and practise your rope work.
- Sail for several days with the boat ready, then do a final tune.
- Tell your insurer about your plans and check the offshore cover conditions.
Our approach at A'gréement
Every year we prepare sailboats and catamarans for long passages, including Outremers built to cover the miles. We start with a full rig inspection, agree a work schedule with you that fits your departure date, then help you put together your spares kit.
To know whether your rig needs replacing and what your insurance requires, read How long does rigging last, and what does insurance cover? For the budget, read How much does it cost to replace rigging?
Frequently asked questions
Should I replace all the rigging before an Atlantic crossing?
Not systematically. It depends on its age, the miles sailed and its condition at inspection. But rigging that is near the end of its life must be replaced before departure: a failure mid-ocean costs far more than the replacement.
How long before departure should I contact a rigger?
Six months for a small sailboat. Nine months to a year for a large boat or a bigger project, to leave time to order parts, do the work and sail with it before leaving.
Which rigging spares should I carry?
Furler foil screws, soft shackles, clevis pins and split pins, a spare halyard and Dyneema. And the rope-work skills to use them.
Is an inspection with the mast up enough?
It already catches many defects, by going up to the masthead. But an inspection with the mast down is the most thorough before a long passage: you see inside the mast, the sheaves, the fittings and the full length of the running rigging.
Does my insurance cover me on an Atlantic crossing?
Not always on the same terms as coastal sailing. Tell your insurer about your plans several months ahead: they may ask for an inspection report or recent rigging.
Preparing a long passage?
Contact us early to schedule the inspection and the work before your departure date.
